Factory Acceptance Testing

FAT confirms reliability and compliance of HV equipment before it leaves the manufacturer — resolving issues early, cutting on-site risk and protecting programme.

Voltage range
11kV · 33kV · 66kV · 132kV
Coverage
UK-wide
Delivered by
HV commissioning engineers & SAPs

Fix it in the factory, not on site

A wiring error found on a works floor costs an hour. The same error found during site commissioning costs an access slot, a lifting plan and often a programme week. Factory acceptance testing exists to shift discovery left — proving equipment against the specification and the approved drawings while the manufacturer still has the panel open and its engineers standing next to it.

We witness and, where scope allows, actively test: mechanical operation and interlocking, primary and secondary wiring verification against schematics, protection relay configuration and functional trip proving, VT/CT circuit checks, LV auxiliary and DC systems, labelling, IP integrity and documentation completeness.

Independent eyes on the specification

Manufacturers test to their own routine schedules, which prove the product — not necessarily the project. Our review compares the build against the purchase specification, the approved single line diagram and the settings schedule, catching the deviations that routine tests are not designed to find: wrong CT ratio fitted, missing spare cores, interlock philosophy that does not match the site switching plan, relay firmware that lacks a required function.

  • HV switchgear and ring main units
  • Protection and control panels
  • Power and distribution transformers
  • Packaged substations and skid-mounted plant
  • Battery storage and generation interface equipment

Carrying FAT into commissioning

Because the same engineers often commission the equipment on site, FAT records become the baseline rather than a filed document. Settings already proven at works are re-verified rather than rediscovered, and the site test programme is shortened accordingly.

Factory Acceptance Testing — questions we get asked

Can you attend FAT on our behalf overseas?
Yes. We attend factory acceptance testing at UK and international manufacturing facilities as the client's technical representative, and report against the project specification.
What does a FAT report include?
A witnessed test record, photographic evidence, a punch list with severity and ownership, and a clear recommendation on whether the equipment should be released for despatch.