Sector

Renewable energy producers

Commissioning the grid connections behind solar, wind and battery storage so clean generation reaches the network safely and exports on time.

Voltage range
11kV – 132kV
Coverage
UK-wide
Support
Commissioning, testing & SAP cover

What makes this sector demanding

  • G99 interface protection and witness testing requirements
  • Export deadlines tied to subsidy, PPA or capacity market dates
  • Remote sites with limited access and long lead-in for switching
  • Inverter and BESS control interfaces that must integrate with HV protection

How we support you

  • Grid connection substation commissioning
  • G99 interface protection testing and witness support
  • Step-up transformer testing and energisation
  • VLF testing of collection and export circuits
  • Protection coordination study covering generation and network devices

G99 and the interface protection reality

For any grid-connected generation or storage scheme, the interface protection is the gate to export. It has to be set correctly, tested demonstrably, and in many cases witnessed by the network operator. We prepare for that as a specific work package: settings confirmed against the connection agreement, test procedures written to the witness's expectations, and results presented in a format that closes the point out on the day.

Battery storage brings extra interfaces

BESS schemes add complexity that traditional generation does not: bidirectional power flow, fast-acting inverter protection that has to coordinate with slower HV devices, auxiliary supply dependencies, and control system signalling between the EMS, the PPC and the HV protection. Commissioning has to prove the HV system and its interaction with those controls, not just the switchgear in isolation.

Working on remote sites

Solar and wind sites are rarely convenient. Test equipment, DC supplies and access all need planning, and a return visit for a missed test is expensive. We mobilise with the full test set required for the scope, and we sequence work so that anything requiring the network operator's presence happens once.

Renewable energy producers — questions we get asked

Do you carry out G99 witness testing?
Yes. We prepare and carry out interface protection testing for G99 connections, including support during network operator witnessing.
Do you commission battery storage systems?
We commission the HV infrastructure and protection for battery storage schemes, including step-up transformers, switchgear, interface protection and the HV side of control and signalling interfaces.

Other sectors we serve

HV support for renewable energy producers

Tell us the voltage range, scope and programme dates. A commissioning engineer will come back to you — not a call centre.